日韩在线一区二区-一区二区久久-中文字幕综合-91日韩在线-99国产精品99久久久久久粉嫩-四虎在线免费视频-日韩美女一级片-二区在线视频-国产亚洲色婷婷久久99精品-一曲二曲三曲在线观看中文字幕动漫-亚洲视频在线观看一区-亚洲黄色三级视频-久久精品香蕉-亚洲人成色777777精品音频-91大片在线观看-视频二区中文字幕-天天夜夜骑-极品少妇在线-一级激情视频-岛国精品视频-牛牛热在线视频-亚洲熟妇av一区二区三区-蜜桃视频在线观看一区-一本色道久久88综合日韩精品-国产欧美久久久精品免费-深爱激情久久-欧美二区三区视频-你懂的在线国产-黄色第一网站-国产精品自拍视频一区

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator nitrogen filling vehicle operation steps

未標題-1.jpg

  

Operation steps of the accumulator nitrogen filling vehicle:

The first step: first open the control box three-wire power supply (380V);

Step 2: Open the unloading valve (position reference manual) on the hydraulic module of the pump station until the system oil pressure drops to 0 MPa (ie, the pressure gauge shows 0);

Step 3: Open the top cover of the accumulator, then unscrew the black cap inside, and rotate the handle of the nitrogen-filled special tool to the maximum position (counterclockwise to the maximum), connect the accumulator, and press the special tool handle. Rotate clockwise. When you hear the sound coming out of the gas, observe the pressure gauge on the tool. The pressure display value is the pressure of the accumulator. At this time, turn it counterclockwise to the maximum and remove the special tool.

When the pressure is less than 5 MPa, it is necessary to flush the accumulator. The above is the detection process.